HomeMy WebLinkAboutPUBLIC HEARING 2010-03-29 WATER IMPROV PROJ 37499
PUBLIC HEARING
SUBMITTED BY. CITY OF LIVONIA ENGINEERING DIVISION
RE PROPOSED WATER SYSTEM IMPROVEMENT PROJECT
On Monday, March 29, 2010, the above hearing was held at the City Hall, 33000
Civic Center Drive, Livonia, Michigan, and was called to order by Council President
McCann at 7 01 p m Present. John Pastor, Brian Meakin, Terry Godfroid-Marecki,
Maureen Brosnan and James McCann Absent: Joe Laura and Laura Toy
Council President McCann stated that this was a Public Hearing regarding a
proposed Water System Improvement Project submitted by the City of Livonia
Engineering Division The proposed project consists of replacing existing water main in
seven (7) geographic areas within the City limits encompassing 36 square miles and the
installation of a new water main and PRV to improve system reliability and pressure in
an eighth location The eight (8) areas will be phased and construction will occur over a
five (5) year period The project construction will involve excavation within the public
right-of-way or within easements in order to install new water main, services, valves,
hydrants and related appurtenances The eight (8) project areas have a combined
estimated construction cost of $26,000,000 This equates to an increase of $0 27 per
water billing unit. Impacts of the proposed project include traffic routing, restoration,
along with dust and noise typical of construction activities There were approximately
eleven (11) individuals present in the audience regarding this matter
Questions and comments from interested persons were given due consideration
by the Council, a transcript of which is on file in the Office of the City Clerk.
37500
The Public Hearing was declared closed at 7 35 p m , on Monday, March 29, 2010
L C �-t�
MAU ' EN COSGROVE, ASSISTANT CITY CLERK