Loading...
HomeMy WebLinkAbout07-K - 2007 Asphalt Preventative Maintenance-Rehabilitation Program ADVERTISEMENT FOR BIDS 2007 LIVONIA ASPHALT PAVEMENT REPAIR PROGRAM CONTRACT 07-K,ASPHALTPREVENTATIVE MAINTENANCE / REHABILITATION PROGRAM CITY OF LIVONIA, MICHIGAN Sealed proposals for the 2007 Livonia Asphalt Pavement Repair Program, Contract 07-K, AsphaltPreventative Maintenance / Rehabilitation Program, will be received at Livonia City Hall, 33000 Civic Center Drive, Livonia MI 48154. Sealed proposals will be received until 2:00 PM., EST, on Tuesday, March 20, 2007, at which time the bids will be publicly opened and read aloud. The City of Livonia seeks proposals for the following: ·MicrosurfacingofClarita, Floral, Foch, Goff, Lathers, Margareta, Pershing, Pickford and Ventura Ct.Streets ·Preventative Maintenance of Clarita, Gillman, Hathaway, Lathers, Pershing, Six Mile Service Drive, Edington, Vacriand Myron and FrancavillaStreets ·Rehabilitation of Bobrich, Brookview, Francavilla, Griffen Ct, McNamara, Northgate, Schoolcraft (westbound), Vacri, Vargo, Whitby, and Myron Streets Work includes removing the existing pavement surface, repairs to pavementcracks, curbs, and base,placing asphalt surface, minor drainage improvements as needed, driveway restoration, surface restoration and maintaining traffic. The approximate quantities for the major items of work for this project area as follows: Cold Milling HMA Surface72,800 Syd HMA, 1800T5,350 Ton HMA, 1800L3,550 Ton HMA, 1800W2,300 Ton Geosynthetic Fabric Interlayer30,970 Syd Micro-Surface Single Cse40,490 Syd Proposals, contract forms, plans and bid specifications under which the work will be done may be obtained, startingMonday, February 26, 2007, from the Office of the City Engineer, 33000 Civic Center Drive, Livonia MI 48154. Prospective bidder’s phone number, facsimile number, street address, and the name of the individual or firm to whom addenda, if any, can be directed are required. A non-refundable fee of $35.00 is required for the Contract Bid Documents or a non-refundable fee of $40.00 is required, if mailed. 2 Each proposal shall be accompanied by a certified check in the amount of 5% of the total bid, payable to the City of Livonia as security for the acceptance of this contract. A bid bond in the Michigan Standard Form, issued by an approved Surety Company, may be furnished in lieu of a certified check. All bids shall be opened publicly at the date and time specified. Each bid shall be recorded together with the name of the bidder. Bids shall be in accordance with the requirements of this notice in order to be deemed “responsive”. Bids are to be submitted in a sealed envelope, plainly marked“BID–2007 LIVONIA ASPHALT PAVEMENT REPAIR PROGRAM,CONTRACT 07-K,ASHPALT PREVENTATIVE MAINTENANCE / REHABILITATION PROGRAM” and received by the City Clerk on or before the time and date given above. No bidder may withdraw his proposal within 120 calendar days after the date set for opening thereof. The right to accept any bid, to reject any or all proposals and to waive defects in proposals is reserved by the City of Livonia. Portions of this Contract may be deleted due to unforeseen circumstances without compensation. Robert J. Schron, P.E. City Engineer Jack Engebretson, Mayor City of Livonia 3 DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION ROBERT J. SCHRON, P.E. JACK ENGEBRETSON City Engineer MAYOR JOHN P. HILL ROBERT J. BECKLEY, P.E. Asst. City Engineer Director of Public Works 33000 CIVIC CENTER DRIVE LIVONIA, MICHIGAN 48154-3097 (734) 466-2571 FAX: (734) 466-2195 2007 Livonia Asphalt Pavement Program Contract No. 07-K As-read bids taken Tuesday, March 20, 2007 1.Florence Cement$1,041,260.45 2Cadillac Asphalt LLC$1,076,488.95 3.Nagle Paving Co. $1,091.208.42 2,550.00 69,000.00 Cost ($) 1,195,065.35 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ #6 92 510.00 Hayball Transport Inc. Unit Price($) $ 15,000.00$ 8,569.50$ 134,678.15$ 2,000.00$ 4,250.00$ 9,078.00$ 38,500.00$ 324,532.00$ 170,592.00$ 110,592.00$ 44,912.30$ 32,600.00$ 16,300.00$ 26,000.00$ 38,592.00$ 5,500.00$ 87,055.65$ 30,057.75$ 348.50$ 12,000.00$ 5,000.00$ 1,507.50$ 5,000.00$ 325.00$ 325.00$ 200.00$ 2,000.00 38,250.00 Cost ($) 1,126,376.67 $ 15,000.00$ 7.25$ 1.85$ 400.00$ 425.00$ 25.50$ 100.00$ 52.00$ 48.00$ 48.00$ 1.45$ 5.00$ 4.00$ 80.00$ 6.00$ 5,500.00$ 2.15$ 27.45$ 8.50$ 12,000.00$ 5,000.00$ 4.50$ 5,000.00$ 65.00$ 65.00$ 4.00$ $ QTY:1,126,065.35$ $ 1,195,065.35$ (60,947.15)$ 1,126,065.35$ -$ 1,111,065.35$ 55,553.27$ 15,000.00$ 1,126,065.35$ 69,000.00$ $ (60,947.15)$ - #5 51 400.00 Ajax Paving Industries, Inc Unit Price($) $ 20,000.00$ 13,297.50$ 110,654.48$ 2,250.00$ 3,250.00$ 14,240.00$ 38,500.00$ 295,511.35$ 168,281.90$ 124,416.00$ 39,956.46$ 29,340.00$ 16,300.00$ 32,500.00$ 32,160.00$ 4,800.00$ 72,073.98$ 32,850.00$ 410.00$ 15,500.00$ 2,000.00$ 1,675.00$ 15,260.00$ 500.00$ 250.00$ 150.00$ 2,000.00 48,750.00 Cost ($) 1,099,216.51 $ 20,000.00$ 11.25$ 1.52$ 450.00$ 325.00$ 40.00$ 100.00$ 47.35$ 47.35$ 54.00$ 1.29$ 4.50$ 4.00$ 100.00$ 5.00$ 4,800.00$ 1.78$ 30.00$ 10.00$ 15,500.00$ 2,000.00$ 5.00$ 15,260.00$ 100.00$ 50.00$ 3.00$ $ QTY:1,088,122.67$ $ 1,126,372.67$ (129,639.83)$ 1,088,126.67$ 4.00$ 1,068,126.67$ 53,406.33$ 20,000.00$ 1,088,126.67$ 38,250.00$ $ (129,635.83)$ (4.00) #4 65 A-Six Asphalt 400.00 Unit Price($) $ 13,100.00$ 13,297.50$ 129,582.22$ 2,250.00$ 3,250.00$ 24,920.00$ 27,643.00$ 299,568.00$ 158,153.00$ 110,592.00$ 39,956.46$ 23,798.00$ 11,613.75$ 30,316.00$ 31,581.12$ 4,800.00$ 72,073.98$ 20,805.00$ 615.00$ 6,716.59$ 4,594.89$ 2,680.00$ 15,260.00$ 300.00$ 250.00$ 750.00$ 2,250.00 31,500.00 Cost ($) 1,091,208.42 $ 13,100.00$ 11.25$ 1.78$ 450.00$ 325.00$ 70.00$ 71.80$ 48.00$ 44.50$ 48.00$ 1.29$ 3.65$ 2.85$ 93.28$ 4.91$ 4,800.00$ 1.78$ 19.00$ 15.00$ 6,716.59$ 4,594.89$ 8.00$ 15,260.00$ 60.00$ 50.00$ 15.00$ $ QTY:1,050,466.51$ $ 1,099,216.51$ (156,795.99)$ 1,050,466.51$ -$ 1,037,366.51$ 51,868.33$ 13,100.00$ 1,050,466.51$ 48,750.00$ $ (156,795.99)$ - #3 42 Nagle Paving Co. 450.00 Unit Price($) $ 2,500.00$ 10,638.00$ 74,254.98$ 3,750.00$ 9,500.00$ 16,020.00$ 28,875.00$ 318,291.00$ 176,811.50$ 114,624.00$ 40,885.68$ 39,120.00$ 16,300.00$ 32,500.00$ 48,240.00$ 9,800.00$ 75,313.26$ 30,660.00$ 410.00$ 2,000.00$ 2,000.00$ 1,340.00$ 1,500.00$ 750.00$ 375.00$ 1,000.00$ 2,550.00 22-Mar-07 41,250.00 Cost ($) 1,076,489.05 $ 2,500.00$ 9.00$ 1.02$ 750.00$ 950.00$ 45.00$ 75.00$ 51.00$ 49.75$ 49.75$ 1.32$ 6.00$ 4.00$ 100.00$ 7.50$ 9,800.00$ 1.86$ 28.00$ 10.00$ 2,000.00$ 2,000.00$ 4.00$ 1,500.00$ 150.00$ 75.00$ 20.00$ $ QTY:1,059,708.42$ $ 1,091,208.42$ (164,804.08)$ 1,059,708.42$ -$ 1,057,208.42$ 52,860.42$ 2,500.00$ 1,059,708.42$ 31,500.00$ $ (164,804.08)$ - #2 55 510.00 Cadillac Asphalt LLC Unit Price($) $ 48,000.00$ 8,569.50$ 101,918.60$ 2,000.00$ 4,250.00$ 9,434.00$ 26,950.00$ 298,007.75$ 159,041.50$ 103,104.00$ 43,363.60$ 32,600.00$ 16,300.00$ 16,250.00$ 25,728.00$ 5,000.00$ 74,908.35$ 30,057.75$ 348.50$ 15,000.00$ 6,000.00$ 1,507.50$ 3,500.00$ 325.00$ 325.00$ 200.00$ $ (179,523.55) Contract 07-K Bid Tab City of Livonia, Michigan -- 2007 Livionia Asphalt Paving Program 2,000.00 NONONONONONO 22,500.00 49,974.0219,280.0022,500.00 Cost ($) 999,480.45 (214,752.05)(214,752.05) 1,018,760.451,018,760.45 1,041,260.45 $ 48,000.00$ 7.25$ 1.40$ 400.00$ 425.00$ 26.50$ 70.00$ 47.75$ 44.75$ 44.75$ 1.40$ 5.00$ 4.00$ 50.00$ 4.00$ 5,000.00$ 1.85$ 27.45$ 8.50$ 15,000.00$ 6,000.00$ 4.50$ 3,500.00$ 65.00$ 65.00$ 4.00$ $ QTY:1,035,238.95$ $ 1,076,488.95$ -$ 1,035,239.05$ 0.10$ 987,239.05$ 49,361.95$ 48,000.00$ 1,035,239.05$ 41,250.00$ $ (179,523.45)$ (0.10) T #1 30 Florence Cement 400.00 QTY:1,018,760.45 Unit Price($) $ 19,280.00$ 7,505.70$ 109,198.50$ 1,625.00$ 3,250.00$ 13,492.40$ 26,776.75$ 287,086.00$ 170,058.90$ 117,619.20$ 40,266.20$ 26,080.00$ 12,225.00$ 17,582.50$ 28,944.00$ 8,875.00$ 72,883.80$ 30,331.50$ 205.00$ 5,000.00$ 1,090.00$ 1,675.00$ 15,260.00$ 175.00$ 175.00$ 100.00$ on mate ion % 2,250 1,143,513 112,500.00 Cost ($) 1,256,012.50 Error Amount Inspector Days $ 19,280.00$ 6.35$ 1.50$ 325.00$ 325.00$ 37.90$ 69.55$ 46.00$ 47.85$ 51.05$ 1.30$ 4.00$ 3.00$ 54.10$ 4.50$ 8,875.00$ 1.80$ 27.70$ 5.00$ 5,000.00$ 1,090.00$ 5.00$ 15,260.00$ 35.00$ 35.00$ 2.00$ $ $ $ 1,041,260.45 As-Bid Mobilization Was Max Exceeded? 450.00750.00 ENGINEER'S ESTIMATE Unit Price($) $ 54,400$ 5,910$ 109,199$ 1,600$ 3,750$ 9,968$ 27,720$ 343,255$ 188,362$ 124,416$ 46,461$ 29,340$ 12,225$ 19,500$ 32,160$ 3,500$ 80,982$ 35,040$ 205$ 4,000$ 7,500$ 1,005$ 200$ 375$ 90$ 100$ $ Max 5% Allowed for Mobilization 5 CORRECTED TOTAL BID AMOUNT 150 Difference from As-Read Total Bid Amount Total Quantity As-Read Difference from Engineer's Estimate I CERTIFY THAT THE ABOVE IS THE TRUE AND AND CORRECSUMMARY OF THE PROPOSALS RECEIVED.SPALDING DEDECKER ASSOCIATES, Inc.905 South Blvd EastRochester Hills, MI 48307 Corrected Base Bid Price Due to Addition Error(s) Addition-Corrected Base Bid Price - Less Mobilizati Ft502.00 LS13,500.00Ea Syd1,1825.00Ton6,24155.00Ton3,55453.00Ton2,30454.00Ton32560.00 Day Corrected Total Bid Difference from Engineer's Esti Units Corrected Base Bid Price Due to Incorrect Mobilizat Pay Item Description Mobilization , Max. 5%LS154,400.00Sidewalk, RemCold Milling HMA SurfaceSyd72,7991.50Dr Structure Cover, Adj, Case 1Ea5320.00Structure Cover, Adj, Case 1Ea10375.00Pavement RepairSyd35628.00HMA ApproachTon38572.00HMA , 1800THMA, 1800LHMA, 1800WGeosynthetic Fabric InterlayerSyd30,9741.50Sidewalk Ramp, ADASft6,5204.50Sidewalk, Conc, 4 inchSft4,0753.00Hand PatchingPavt Joint and Crack Repr, Det 7Ft6,4325.00Overband Crack and Fill, Roadbed, ModifiedMicro-Surface, Single CseSyd40,4912.00Curb and Gutter, ReprFt1,09532.00Surface Restoration, SoddingSyd415.00Traffic Control, Non-Detour RoadsLS14,000.00Erosion ControlLS17,500.00Surface Restoration, SeedingSyd3353.00Permanent Pavement MarkingsLS1200.00Sprinkler Head, RelocateEa575.00Sprink ler Head, AdjustEa518.00Sprinkler LineStructure Frame & Cover Furnish Only AS-READ BASE COST Inspector Days AS-READ TOTAL BID AMOUNT 3/22/2007