Loading...
HomeMy WebLinkAbout07-P - St. Michael's Parking Lot Storm Relief Sewer NOTICE TO BIDDERS ST. MICHAEL’S PARKING LOT STORM RELIEF SEWER CITY OF LIVONIA, MICHIGAN CONTRACT 07- P Sealed proposals will be received by the City of Livonia, Michigan as owner until 2:00 PM on Tuesday, June 19, 2007 at the Livonia City Hall, 33000 Civic Center Drive, Livonia, Michigan, at which time said proposals will be opened and publicly read. The City of Livonia seeks proposals for the following: The construction of approximately 160 l.f. of 8” storm sewer and related items of work. Proposals, contract forms, plans and specifications under which the work will be done may be obtained, starting Monday, June 4, 2007, at the Office of the City Engineer, 33000 Civic Center Drive, Livonia, Michigan. A NON-REFUNDABLE CHECK in the amount of Twenty-Five Dollars ($25.00) ($30.00 if mailed) will be required for each set of bidding documents obtained. Each proposal shall be accompanied by a certified check in the amount of 5% of the total bid, payable to the City as security for the acceptance of the contract. A bid bond in the Michigan Standard Form issued by an approved Surety Company may be furnished in lieu of a certified check. No bidder may withdraw his proposal within sixty (60) calendar days after the date set for opening thereof. The City reserves the right to reject and bid or all bids and waive irregularities in bids. ADDRESS ALL BIDS TO THE CITY CLERK IN A SEALED ENVELOPE WHICH CLEARLY STATES THE NATURE OF THE BID. Robert J. Schron, P.E. City Engineer Jack Engebretson, Mayor CITY OF LIVONIA NB DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION ROBERT J. SCHRON, P.E. JACK ENGEBRETSON City Engineer MAYOR JOHN P. HILL ROBERT J. BECKLEY, P.E. Asst. City Engineer Director of Public Works 33000 CIVIC CENTER DRIVE LIVONIA, MICHIGAN 48154-3097 (734) 466-2571 FAX: (734) 466-2195 St. Michaels Storm Sewer Relief Contract No. 07-P As-read bids taken June 19, 2007 1. RS-RE Enterprises$20,776.51** as corrected by City of Livonia 2. Hayball/Summit Transport$23,775.00 3. San Marino Excavating$25,000.00 $1.00$4.00$0.95$0.60$7.00$7.00 $42.00$10.00$20.00 $760.00$105.00$110.00 $2,970.00 UNIT PRICE San Marino Excavating7676 Rushton RdBrighton, MI 48116 $50.00 $400.00$400.00$300.00$375.00$375.00 $1,500.00$1,400.00$7,040.00$3,200.00$2,850.00$1,710.00$1,785.00 TOTAL PRICE $5.00$2.50$2.00$2.00$5.00$5.00 $44.00$20.00$95.00$95.00$21.00 $1,500.00$1,400.00 UNIT PRICE Summit/Hayball Transport, Inc12550 Farmington RdLivonia, MI 48150 $500.80$150.00$300.00$300.00 $425.00$100.00 $3,075.00$1,050.00$3,000.00$1,600.00$2,715.00$1,839.96$1,955.00 TOTAL PRICE $3.13$1.00$1.00$4.00$4.00 $18.75$21.25$10.00$90.50$23.00 $102.22 $3,075.00$1,050.00 UNIT PRICE CITY OF LIVONIA BID TABULATION CONTRACT 07- PRS-RE Enterprises, LLC32125 Block StreetGarden City, MI 48135 ST. MICHAEL'S PARKING LOT STORM RELIEF SEWER 1 ea.1 ea. 20 l.f.10 l.f. 30 ton18 ton85 ton75 s.y.75 s.y. 160 l.f.160 s.f.150 s.f. 1,600 s.f. QUANTITY & UNIT ITEM Place Catch Basin "A" with Frame and Cover "B"(Over Existing 12" Storm Sewer)Place Inlet "A" with 2' Sump 1040 Frame with Type M2 CoverPlace 8" A.B.S. or P.V.C. Truss Pipe w/Tr. "A"(Tr. "A" M.D.O.T. Class II Sand)Remove and Replace 6' Tall Chain Link FenceSaw Cut 4" ConcreteSaw Cut 8"- 12" Bituminous PavementRemove 8"- 12" Bituminous PavementRemove 4" Concrete SidewalkPlace 2 1/2" Bituminous Base Course (1100L, 20A)Place 1 1/2" Bituminous Surface Course (1100T, 36 A)Place 4" to 8" Thick 21 AA Limestone Sub baseRestoration (Class "A" Sod w/1" Topsoil)Seed, Mulch and Fertilizer w/ 3" 1.2.3.4.5.6.7.8.9.10.11.12.13. $5.00$6.00 $10.00 $600.00 @ $200.00 8 UNIT PRICE San Marino Excavating7676 Rushton RdBrighton, MI 48116 $240.00$175.00$675.00$300.00 $1,000.00 $23,775.00 TOTAL PRICE $2.50$4.50 $15.00 $150.00 @ 200.00 $27,575.00$38,790.00 5 UNIT PRICE Summit/Hayball Transport, Inc12550 Farmington RdLivonia, MI 48150 $260.00$230.30$475.50$300.00$600.00 $1,500.00 $20,776.56* TOTAL PRICE C&G Myers Const.Bidigare Contractors : $3.29$3.17 $16.25 $150.00 @ $200.00 $1,500.00 UNIT PRICE 5 CITY OF LIVONIA BID TABULATION CONTRACT 07- PRS-RE Enterprises, LLC32125 Block StreetGarden City, MI 48135Additional Bidders ST. MICHAEL'S PARKING LOT STORM RELIEF SEWER days 2 sta. 16 l.f.70 l.f. 150 s.f. lump sum QUANTITY & UNIT TOTAL BID: ITEM Place 6" Edge DrainPlace Fast Dry Pavement Markings 4" Solid White LanePlace 4" Concrete SidewalkAudio Video TapingInspector Days* Insurance 14.15.16.17.18.Bids Advertised:Michigan Contractor & Builder - June 4, 2007Livonia Observer & Eccentric - May 31, 2007Bids Opened: June 19, 2007* Corrected by City of Livonia $10.00$90.00 $200.00$640.00$525.00$525.00 $760.00 $2,970.00$6,720.00$1,520.00$3,150.00$1,980.00$1,700.00 TOTAL PRICE Page 1 San Marino Excavating $160.00$350.00$900.00 $1,200.00$1,600.00 $25,000.00 TOTAL PRICE Page 2 San Marino Excavating