HomeMy WebLinkAboutPLANNING MINUTES 2016-04-05 MINUTES OF THE 1,085TH PUBLIC HEARINGS AND REGULAR MEETING
HELD BY THE CITY PLANNING COMMISSION
OF THE CITY OF LIVONIA
On Tuesday, April 5, 2016, the City Planning Commission of the City of Livonia
held its 1,085th Public Hearings and Regular Meeting in the Livonia City Hall,
33000 Civic Center Drive, Livonia, Michigan.
Mr. Ian Wilshaw, Chairman Pro Tem, called the meeting to order at 7:00 p.m.
Members present: Glen W. Long Elizabeth McCue Carol Smiley
Peter H. Ventura Ian Wilshaw
Members absent: Gerald Taylor
Mr. Mark Taormina, Planning Director, and Ms. Margie Watson, Program
Supervisor, were also present.
Acting Chairman Wilshaw informed the audience that if a petition on tonight's
agenda involves a rezoning request, this Commission makes a recommendation
to the City Council who, in turn, will hold its own public hearing and make the
final determination as to whether a petition is approved or denied. The Planning
Commission holds the only public hearing on a request for preliminary plat and/or
vacating petition. The Commission's recommendation is forwarded to the City
Council for the final determination as to whether a plat is accepted or rejected. If
a petition requesting a waiver of use or site plan approval is denied tonight, the
petitioner has ten days in which to appeal the decision, in writing, to the City
Council. Resolutions adopted by the City Planning Commission become effective
seven (7) days after the date of adoption. The Planning Commission and the
professional staff have reviewed each of these petitions upon their filing. The
staff has furnished the Commission with both approving and denying resolutions,
which the Commission may, or may not, use depending on the outcome of the
proceedings tonight.
ITEM #1 PETITION 2016-03-02-04 ZEAL CREDIT UNION
Ms. Smiley, Secretary, announced the first item on the agenda, Petition 2016-03-
02-04 submitted by Colliers International, on behalf of Zeal
Credit Union, requesting waiver use approval pursuant to
Section 9.03 of the City of Livonia Zoning Ordinance #543, as
amended, to operate credit union branch and offices at 17250
Newburgh Road, located on the east side of Newburgh Road
between Six Mile Road and Bennett Avenue in the Southwest
1/4 of Section 8.
April 5, 2016
27510
Mr. Taormina: Zeal is proposing to relocate its corporate offices and open a
customer branch within an existing building located near the
northeast corner of Newburgh and Six Mile Roads. The subject
property was most recently occupied as a AAA office center, but
was originally built in the early 1970's as a tennis and racquet
club. The property is roughly 2.94 acres in area. It includes 285
feet of frontage along Newburgh Road and has an average
depth of about 450 feet. The current zoning of the property is
OS, Office Services. Under the OS district regulations, credit
union offices, banks and saving and loans are allowed with
waiver use approval as set forth under the provisions of
Sections 9.03(d) and 9.03(e) of the Zoning Ordinance.
Additionally, the subject site is located within a Special Area
Development Control district. This grants the Planning
Commission and City Council extra review authority with respect
to exterior alterations and signage. The existing building is two
levels, but on the outside it appears as a one-story structure.
The total floor area is about 54,000 square feet. The plans that
were submitted with the application show that a majority of the
interior space will be used for general office purposes. There is
about 3,200 square feet of the building, including the small
addition located in the northwest corner of the building, that will
be used as a customer branch. The north and west elevations of
the building would be completely renovated to reflect Zeal's
corporate image. The main focal point of the building will
become the northwest corner where there is a small 570 square
foot addition proposed, but more significantly, there is a new
raised tower element that will serve as the main entrance to the
customer branch. That is basically a glass curtain wall that
projects above the existing pitched roofline and consist of a pre-
finished aluminum window/wall system. There is also some new
concrete stairs and a ramp that would provide customer access
to the main entrance to the branch, but the main office entrance
would be located near the middle portion of the building. There
are some improvements that are not shown on the rendering,
but it does show where the second entrance would be located
on the north elevation of the building providing access to the
majority of the employees within the office complex. This side of
the building as well as the north portion includes a pre-finished
metal louver screen along the top section of the wall as well as
a pre-finished metal canopy. The terracotta-colored fascia that
runs along the building is really a canopy that projects out from
the front of the building, and then behind that, higher up, is the
louvered pre-finished panel screen. The existing roof line on
these portions of the building will not be altered. These are
panels that will project along the face of the building to give it a
flat roof appearance even though there is a pitched roof behind
April 5, 2016
27511
those screens. The most significant change will be modifications
to the landscaping as well as the main entryway. Currently,
there is a single drive entrance. It's a two-way drive located in
the northwest corner of the site. That will be modified to a
boulevard entryway or a median will be created. The driveway
will be widened a little bit to the south. The landscape median
will be added between the incoming and outgoing traffic. Also, a
number of trees will be removed from the front of the property.
Currently, there is a berm. There are a number of tall, mature
evergreen trees as well as other deciduous trees. Those would
be removed. The plan shows the 20 some odd trees that would
be removed and then it would be re-landscaped. It would be a
more formal type of landscaping. Fewer trees would be planted
along the street frontage but there would be additional plantings
provided. The berm would be removed although the plan
doesn't show the details. I believe the intent there is to lower the
grade and replant the frontage. These would be Little Leaf
Lyndon trees. It's a good street tree for this application. There
are also changes to the parking lot. Those are not as significant,
but with the modification to the entryway, it will necessitate the
removal of some of the interior landscaping within the site. It will
be replanted. They are also proposing ATM service. Vehicles
that would utilize the ATM would come around from the south
side and turn around. There is a stacking lane along the north
side of the median. The lane serving the ATM is separate from
the drive aisle that provides access to the parking along the
north side of the site. There is a block screen wall that runs
along the north side of the property that will separate this
commercial property from the adjacent residential properties.
Required parking is based on the two main uses of the building,
general office and banking. The general office use requires one
space for every 200 square feet of useable floor area. The other
main use is the credit union. That requires one space for each
150 square feet of useable floor area. Added together, a total of
206 parking spaces are needed to comply with the ordinance.
The plan shows a total of 216 parking spaces. That includes 82
surface parking lot spaces as well as 124 covered spaces
located in the lower level of the building. There is underground
parking provided at this facility. That provides sufficient parking
to meet the ordinance; however, all the parking shown on this
particular plan is shown at 9 feet in width. We would request
that some of those spaces be modified to be 10 feet. That is
what the ordinance requires when they provide public parking.
The employee parking is fine at 9 feet, but we estimate about 17
parking spaces would have to be modified to be 10 feet in width
in order to comply with the ordinance. I'm not sure if they need
the 206 parking spaces. I don't believe they would lose that
April 5, 2016
27512
many spaces by converting 17 of those to 10 foot wide spaces.
Lastly, there is more than likely going to be an overage in
signage. What the ordinance allows for this single use on an
office zoned property is either a ground mounted sign at 16
square feet or a wall identification sign at 16 square feet, not
both. So the petitioner will have to either chose from one or the
other or petition the Zoning Board of Appeals for a variance. As
it stands now, they're showing a monument sign at the
entryway. We don't have details on that but they are also
showing a wall sign. We don't have information on the size of
that sign, but to the extent that it would exceed 16 square feet it
would also require a variance. So with that, I'd be happy to read
out the correspondence.
Mr. Wilshaw: Yes. Go ahead.
Mr. Taormina: There are four items of correspondence. The first item is from
the Engineering Division, dated March 14, 2016, which reads as
follows: "In accordance with your request, the Engineering
Division has reviewed the above referenced petition. The legal
description provided with the petition appears to be correct and
is acceptable to this office. The existing parcel is assigned an
address of 17250 Newburgh Road, which should be used in
conjunction with this petition. The existing building is currently
serviced by sanitary sewer and water main. The submitted
drawing does not indicate any existing or proposed services, nor
does it propose any modifications to the existing services, so we
are unable to comment on those issues at this time. Should the
exiting leads need to be modified or replaced, Engineering
Department permits will be required for any work within the
Farmington Road right-of-way. The site is currently serviced by
an existing storm sewer system that connects to a City-owned
system at the southeast corner of the lot. Storm water detention
will be required per City of Livonia design standards for any
areas improved with the project, including any impervious areas
removed and replaced or any new impervious areas." The letter
is signed by David W. Lear, P.E., Assistant City Engineer. The
second letter is from the Livonia Fire & Rescue Division, dated
March 17, 2016, which reads as follows: "This office has
reviewed the site plan submitted in connection with a request to
operate credit union offices and branch on property located at
the above referenced address. We have no objections to this
proposal with the following stipulations: Subject building(s) are
to be provided with an automatic sprinkler system, and on site
hydrants shall be located between 50 feet and 100 feet from the
Fire Department connection." The letter is signed by Keith Bo,
Senior Fire Inspector. The third letter is from the Division of
April 5, 2016
27513
Police, dated March 16, 2016, which reads as follows: "I have
reviewed the plans in connection with the petition. I have no
objections to the proposal." The letter is signed by Brian Leigh,
Sergeant, Traffic Bureau. The fourth letter is from the Inspection
Department, dated March 22, 2016, which reads as follows:
"Pursuant to your request, the above-referenced petition has
been reviewed. This Department has no objections to this
petition." The letter is signed by Jerome Hanna, Assistant
Director of Inspection. That is the extent of the correspondence.
Mr. Wilshaw: Are there any questions of the Planning Director?
Ms. Smiley In the letter from David Lear, it says in the second paragraph,
"Should the existing leads need to be modified or replaced,
Engineering Department permits will be required for any work
within the Farmington Road right-of-way."
Mr. Taormina: It is probably carryover from a previous letter and I think he
means Newburgh Road right-of-way.
Ms. Smiley: Okay. I have one more question. On the picture, do you see
where the handicap parking is?
Mr. Taormina: I do.
Ms. Smiley: Is that a driveway through there? Can you drive between where
the handicap parking is and . . .
Mr. Taormina: Yes. There is a drive aisle right there. I'm looking for another
plan that may depict that better. There is parking on the west
side of the drive aisle and then the barrier free parking is
provided on the east side of the drive aisle. More than likely they
will have to move that closer to the entryway. The spaces that
are closest to the entryway are required to be barrier free. They
do have a ramp there. So maybe that's the reason they have
the barrier free spaces located where they are. They may not
have to alter that now that I think about it.
Ms. Smiley: Okay. Thank you.
Mr. Ventura: At the study session, there were a number of objections to
elements of this plan, specifically the color of the building. the
orange color on the outside, the amount of landscaping in front
that would be removed, and the overall commercial appearance
of the building. Have you had any conversation with the
petitioner since our study session?
April 5, 2016
27514
Mr. Taormina: Yes, we did have a conversation with the architect. I discussed
with him possible design options. They are here this evening
and hopefully they can respond to some of those concerns that
were expressed at the study session.
Mr. Ventura: Thank you.
Mr. Wilshaw: Is that all, Mr. Ventura?
Mr. Ventura: Yes.
Mr. Wilshaw: Would the petitioner like to come forward? We will need your
name and address for the record please.
Ed Dunne, Senior Project Manager, Colliers International, 2 Corporate Drive,
Suite 300, Southfield, Michigan 48076. Good evening.
Mr. Wilson: Is there anything you'd like to add to the presentation?
Mr. Dunne: We do have a couple of material samples as well as a little bit of
revised color that was discussed shortly after the study session.
I don't have them electronically but I'm happy to pass them
around if you guys would like to take a look at them.
Mr. Wilshaw: One thing you may want to do is hold them up so that the
camera can see these items as well when you describe them.
Mr. Dunne: With the orange banding around the perimeter of the building,
what we had shown in the renderings on your screen was what
is actually nonconforming signage that is inside of what Zeal
calls the cube, which is a primary design element of the
building. So we removed that and we think that it really tones
down the volume of orange that you all were looking at in the
renderings. I think it provides a little bit of a softness to the
actual building. The materials are a wood grain metal panel that
is the actual soffit of the ribbing system. This is an actual
sample of the material that will be used for the fascia. The
smaller samples are the vertical roof slates that you see at the
face of the building. This will actually be the paint color of the
building upon completion. The building is an E.I.F.S. building
and we'll be repairing and repainting the building.
Mr. Wilshaw: Thank you. Is there anything else that you'd like to add before
we go to any questions?
April 5, 2016
27515
Mr. Dunne: I guess we can certainly start with your questions. We have a
representative from Zeal Credit Union who would like to take a
minute to speak with you guys whenever you're ready too.
Mr. Wilshaw: Are there any questions at this point for the architect?
Mr. Ventura: Mr. Dunne, are you the architect?
Mr. Dunne: I am the owner's representative. The architect is not in
attendance this evening but we can certainly answer any
questions you may have.
Mr. Ventura: Is that the same color orange that you presented at the study
session?
Mr. Dunne: We didn't actually present any physical samples at the study
session.
Mr. Ventura: Okay. That you attempted to replicate.
Mr. Dunne: Yes. Exactly. This material is the actual material that will be on
the face of the building.
Mr. Ventura: So no consideration was given to changing it?
Mr. Dunne: What we did, sir, was we removed what is actually
nonconforming signage at the cube of the building. If you see
the starburst in the Zeal logo on the inside of the building, it is a
large part of the orange and we actually, because it's
nonconforming, we didn't feel that it should actually be shown in
context.
Mr. Ventura: I guess, Mr. Dunne, my observation is that this design of this
building is so commercial and so out of character with the rest of
the buildings in this neighborhood that I think that you're asking
to put less than 10 percent of that building into a quasi-
commercial use in terms of a branch. But the treatment of the
building is so commercial that the fact that this is an office
building is lost. And exacerbating the whole impact of this
building is the fact that you want to take all the trees in front
down and reduce the berm or eliminate the berm. If you look
across the street at the financial institution on the corner, it
doesn't carry any of these kinds of commercial look. Forgive me
for this and I don't mean to be pejorative, but there isn't a fast
food restaurant in this area and that's the kind of feel I'm getting
from the treatment of this building. And understand, I'm here
trying to help you.
April 5, 2016
27516
Mr. Dunne: Yes, sir.
Mr. Ventura: It may not sound that way but we'd like to see something a little
more in character and spirit with the buildings that have been
built over many years in this Laurel Park area.
Mr. Dunne: I certainly appreciate what you're saying. I respectfully disagree.
I think that the design of this building is in fantastic taste. I think
it's going to be an incredible improvement to the area. It's a 43
year old building, sir. It's 43 year old landscaping. In our opinion,
it really needs to be updated and the landscaping along with the
building we believe is going to provide a landmark building for
the City of Livonia.
Mr. Ventura: It's not about taste. It's about conforming to the area and about
being consistent with the rest of the buildings that are there. I
mean there are other companies that use orange as an accent
color. I'm sure you're familiar with FedEx. They have a store
right on the corner of Newburgh and Six Mile. There is no
orange on the outside of their building. It's not about how much I
like orange. It's about what's happened in this area with other
corporate citizens over time and the appearance of the buildings
there. It's that simple.
Mr. Dunne: Understood.
Mr. Ventura: Thank you.
Mr. Wilshaw: Is there anyone else wishing to speak at this time? Seeing
none, if the representative from Zeal Credit Union would like to
step forward and speak, we'd love to hear from you. Please
state your name and address for the record.
Angie Kogel, Senior Vice President of Member Services, Zeal Credit Union,
29550 Five Mile Road, Livonia, Michigan 48154. Good evening.
I've been with the credit union for over 43 years. I'm also a
resident of Livonia. I've lived in Livonia since 1984, and we have
a number of our 180 employees who also are residents of
Livonia. We had a branch in Livonia for over 40 years. About 20
years ago, we decided that we needed to relocate our
headquarters, which was located in Dearborn, because we
needed a bigger facility. It was about 1995 that we relocated to
our existing building on Middlebelt. In that 20 years that we've
been in Livonia, we've grown from $110 million in assets to well
over $540 million in assets. We also outgrew that building on
Middlebelt and determined that we needed to relocate to a new
April 5, 2016
27517
bigger facility. Our goal was to stay in the City of Livonia since
we've been here for 20 years. We have actually over 10,000 of
our almost 60,000 members living in the City of Livonia and they
hold $19 million of our $540 million in assets. As we were
looking for that larger space, we found that building on
Newburgh that had been vacant for about eight years. I saw that
building for many years. I live right on the corner of Six Mile and
Newburgh. That building, we were able to purchase it and it's
our goal to have a very modern, sophisticated building. In
addition, we've also made a commitment to build another
branch in Livonia. We just recently purchased property on
Middlebelt. So we will now have two branches in Livonia and
we'd just like to thank the City of Livonia for the great
partnership we've had for these past over 40 years. Thank you.
Mr. Wilshaw: Thank you, Mrs. Kogel. As I understand too, when we looked at
the plans there were some nice design elements in terms of
outdoor dining for your employees, some rollup doors. I assume
you're going to have cafeteria services and other facilities for
employees.
Ms. Kogel: Yes, those are a lot of things that we're actually looking at. Right
now, we do have a couple rollup doors. I'm not sure that we
committed to those rollup doors, but we are certainly going to
have a very nice cafeteria facility for our employees with outdoor
seating. I just don't know if it will have that garage door opening.
We're going to have approximately 88 employees who will move
on day one to that facility.
Mr. Wilshaw: And you're projecting growth in terms of employees over the
coming years?
Ms. Kogel: Yes. We've projected growth for over the next five years to
almost 200 employees.
Mr. Wilshaw: Thank you. I appreciate that background.
Ms. Kogel: You're welcome.
Ms. Smiley Is this a national credit union or is this a Michigan credit union?
Ms. Kogel: We're an open credit union. Anybody can join. But primarily,
we're the Southeast Metro Detroit credit union. So we do have
members from all over the country, but primarily just southeast
Michigan.
Ms. Smiley: And this is going to be your headquarters?
April 5, 2016
27518
Ms. Kogel: This will be our headquarters. We relocated our headquarters
from the Middlebelt facility which is about 24,000 square feet to
this facility.
Ms. Smiley: Is this a corporate design or is this unique to your building?
Ms. Kogel: Well, it's nothing like the facility we have now that we've been in
since 1995. So it's a new design. It's new branding. We have
Greg Wohler here from Edge Creative to talk about our
branding. This is a new look for us, but we actually have 12
branches and when we brought in that color orange, all our
members walked in and they said, wow. This is an incredible
new look for you guys. This is an incredible color and they loved
it. Especially at our Livonia branch, if you've ever walked into
that branch, it's a beautiful branch and our members just raved
about the colors.
Ms. Smiley: Okay. Thank you.
Mr. Wilshaw: Did your branding expert wish to come forward and speak at all
about what he's heard so far?
Greg Wohler, 23452 Woodward Avenue, Ferndale, Michigan. Just a couple
things real quick. The first one I wanted to mention is just
potentially addressing something that Angie had said when she
was up here that might be relevant as well. In addition to the
outdoor seating areas that you mentioned that the staff will be
able to take advantage of, there is also, towards the back of the
building, I think it's almost 6,000 square foot community room.
That's part of the plan as well. That is designed specifically for
residents of the City of Livonia to utilize for whatever method
they choose to utilize it, community meetings, local charity use,
anything like that they would like to use and participate in. And
that has a separate entrance towards the back of the building
which you can see on the plan there. So that's another kind of
piece that extends a little bit beyond just the corporate office
and branching purpose of the building. A couple points in
regards to the color and to the design that I just wanted to
make. In the study session where you guys reviewed the
printouts that I believe you have in front of you now, I did just
want to point out that the color on the printout is very much off
the actual color. It is much, much brighter in that printout than it
is in reality. So I did just want to address that. You had
mentioned comments about looking at the color and potentially
making some changes to it. After we looked at the printouts and
kind of evaluated what you had seen, one of the things we
April 5, 2016
27519
wanted to point out was in the sample of the material, and
again, we're happy to circulate it around. We held it up earlier
for the camera, but if you want to take a look at it, you will notice
that the orange color is far more muted in reality than what you
see in that printout. So I do think that the printouts that you
initially saw and the on-screen images were definitely not
representative of that actual color that's going to be on the
building. I would point to the sample and try to take a look at
that because it is a far more muted version of the orange. Just a
comment in regards to the orange as a whole. It really is the
center point and focal point of the credit union's brand. The idea
behind the brand and behind the name, which was changed as
Angie had mentioned in the fall of last year, was to represent
the concept of passion. And the passion that we talk about in
the brand is the passion the credit union has for its members
and the way that they treat their members. In fact, we created a
definition around the word zeal that said it was passionate
devotion to a cause, and the cause was the credit union's
members. All of this came out of significant research that was
done with the membership of the credit union to try and identify
why the members of the credit union love this organization as
much as they did. When you look at the satisfaction ratings that
we had seen in the 97th percentile, it was literally off the charts.
We work with credit unions all over the country but this one was
significantly higher than what we see normally in the 80th
percentile for satisfaction. So we did a lot of research to
determine what that was all about. What we found out was that
the members of the credit union said that the employees and
the people of the credit union really worked with a passion for
those members. So that brand was designed around this
concept of passion. In putting it together, we wanted to find a
color that represented this idea of passion. So the orange was
not selected lightly. It was targeted specifically to address that
issue and element of the brand and it's a major piece. So when
Angie says the members come in and really relate to the color, I
think a lot of that has to do with the fact that they relate to the
passion that the credit union has for their members and they're
seeing that represented in the color. One final point and then I'll
stop. When you talk about the exterior of the building and kind
of what it represents here and how it juxtaposes against the
other branches, the credit union has 11 branches. One of the
things that we're in the process of doing right now is looking at
the exterior of all those branches in all the communities that
they exist. This design, this look that you see here, which will
launch in Livonia, first with this building and then second with
the new branch that Angie had mentioned that they've just
acquired the property for, those two exteriors will set the tone for
April 5, 2016
27520
the design at all of the 11 branches. What we're trying to do is
set a consistent and common theme that can be represented in
all the facilities across the board. One of the things we've done
in the process of doing this is examine bank and credit union
branching design all across the country to look at various trends
that are out there and to try to identify a best practices brand
mark, for lack of a better word, which is the orange ribbon that
you see, and to try to represent that across the board in all of
the branches. Again, the credit union has done most things first
in Livonia here over the last 40 years and they want to do this
first here in Livonia as well to set the tone for the other branches
across the board. Thank you for your time.
Mr. Wilshaw: Thank you, Mr. Wohler. Are there any questions?
Ms. Smiley: I would like you to pass the color sample around.
Mr. Wilshaw: That's the reason we like to have these sample boards, so we
can actually see the true color.
Mr. Wohler: It's hard to represent those colors on printouts like that and to
get them accurate. It's better to use the actual samples I think.
Mr. Wilshaw: Definitely. Thank you very much. I appreciate your comments.
Mr. Wohler: Thank you.
Mr. Wilshaw: Is there anybody else in the audience wishing to speak on this
item? If not, Mr. Dunne, could you please come forward. I did
have one question for you.
Mr. Dunne: Yes, sir.
Mr. Wilshaw: The generator pad that is there has a chain link fence around it,
and the plan indicates that it will have a fenced in generator.
There is no generator there currently. I assume you're going to
have a generator placed there.
Mr. Dunne: We will.
Mr. Wilshaw: Will it be the same chain link fencing that's around it now or are
you looking to incorporate that better into the building design?
Mr. Dunne: I think we will incorporate it into the building design. I know
there's some landscaping that is proposed around it, but if there
a specific enclosure that the City would like to see, I'm certain
April 5, 2016
27521
that we're open to incorporating whatever you want into the
design.
Mr. Wilshaw: Given a choice, being that it's in a prominent position right at the
front of the building, we would probably like to see a masonry
enclosure that matches the building or even using the screening
panels or something similar to what the other building design
elements have.
Mr. Dunne: Sure. The actual screening panels were a topic of discussion for
the generator enclosure. So if that's something you guys would
like to see, we'd be happy to incorporate something like that into
our design.
Mr. Wilshaw: We'll see what the approving resolution provides for, but
generally we like to see something other than a chain link fence.
Mr. Dunne: Absolutely.
Mr. Wilshaw: Thank you. Are there any other questions?
Ms. Smiley Through the Chair to Mark, what is the landscaping percentage?
Mr. Taormina: The landscaping percentage is about 18 percent. We typically
look to have a minimum of 15 percent of the site landscaped
exclusive of the road rights-of-way. Staff has determined that
what is shown on this plan constitutes about 18 percent of the
site. So it does conform to our ordinance.
Ms. Smiley: Okay. Thank you.
Mr. Long: The slates on the top, do they go all the way around the building
or is it just on the façade facing Newburgh?
Mr. Dunne: It's primarily the west and north elevations of the building.
Mr. Long: And there is la gap in between each one of the slates? How big
of a gap is it? How easy is it to see through?Are they angled?
Mr. Dunne: They are actually angled and it's going to be a little bit difficult. I
don't think it's going to necessarily look . . . you'll be able to see
some through it, but it's going to be pretty opaque. We need
some space between the slates for wind loads and snow loads
and that kind of thing in order to accomplish it for the structural
engineer.
Mr. Long: Thank you.
April 5, 2016
27522
Mr. Wilshaw: Anyone else? Seeing none, are there any final comments you
want to make, Mr. Dunne? Are you all set?
Mr. Dunne: I think so.
Mr. Wilshaw: We will close the public hearing and a motion is in order.
On a motion by Long, seconded by Smiley, and adopted, it was
#04-26-2016 RESOLVED, that pursuant to a Public Hearing having been
held by the City Planning Commission on April 5, 2016, on
Petition 2016-03-02-04 submitted by Colliers International, on
behalf of Zeal Credit Union, requesting waiver use approval
pursuant to Section 9.03 of the City of Livonia Zoning Ordinance
#543, as amended, to operate credit union branch and offices at
17250 Newburgh Road, located on the east side of Newburgh
Road between Six Mile Road and Bennett Avenue in the
Southwest 1/4 of Section 8, which property is zoned OS, the
Planning Commission does hereby recommend to the City
Council that Petition 2016-03-02-04 be approved subject to the
following conditions:
1. That the architectural site plan marked Sheet A050 dated
March 4, 2016, as revised, prepared by Neumann Smith
Architecture, is hereby approved and shall be adhered to;
2. That no less than 17 parking spaces located nearest the
customer branch entrance shall be a minimum of ten feet
(10') in width;
3. That the landscape plan marked Sheet No. L2 dated March
4, 2016, as revised, prepared by Nowak & Fraus
Engineers, is hereby approved and shall be adhered to;
4. That all disturbed lawn areas shall be sodded in lieu of
hydroseeding;
5. That underground sprinklers are to be provided for all
landscaped and sodded areas, and all planted materials
shall be installed to the satisfaction of the Inspection
Department and thereafter permanently maintained in a
healthy condition;
6. That the exterior elevation plans marked Sheet A400 dated
March 4, 2016, as revised, prepared by Neumann Smith
Architecture, are hereby approved and shall be adhered to;
April 5, 2016
27523
except that the petitioner shall consider incorporating minor
changes that have the effect of improving the appearance
of the building such as adding support columns and or
muting or changing the color of the fascia and canopy;
7. That all rooftop mechanical equipment shall be concealed
from public view on all sides by screening that shall be of a
compatible character, material and color to other exterior
materials on the building;
8. That the three walls of the trash dumpster area shall be
constructed out of building materials that shall complement
that of the building. The enclosure gates shall be of solid
panel steel construction or durable, long-lasting solid panel
fiberglass. The trash dumpster area shall be maintained
and when not in use closed at all times;
9. That the enclosure of the generator area shall be
constructed out of building materials that shall complement
that of the building;
10. That all light fixtures shall not exceed twenty feet (20') in
height and shall be aimed and shielded so as to minimize
stray light trespassing across property lines and glaring
into adjacent roadways;
11. That only conforming signage is approved with this petition,
and any additional signage shall be separately submitted
for review and approval by the Zoning Board of Appeals;
12. That no LED lightband or exposed neon shall be permitted
on the site including, but not limited to, the building or
around the windows;
13. That the specific plans referenced in this approving
resolution shall be submitted to the Inspection Department
at the time the building permits are applied for, and
14. Pursuant to Section 19.10 of Ordinance #543, the Zoning
Ordinance of the City of Livonia, this approval is valid for a
period of ONE YEAR ONLY from the date of approval by
City Council, and unless a building permit is obtained, this
approval shall be null and void at the expiration of said
period.
Subject to the preceding conditions, this petition is approved for
the following reasons:
April 5, 2016
27524
1. That the proposed use complies with all of the general
waiver use standards and requirements as set forth in
Section 19.06 of the Zoning Ordinance#543; and
2. That the proposed use is compatible to and in harmony
with the surrounding uses in the area.
FURTHER RESOLVED, that notice of the above hearing was
given in accordance with the provisions of Section 19.05 of
Zoning Ordinance #543, as amended.
Mr. Wilshaw: Is there any discussion?
Mr. Long: I think we should add a condition for the generator to be
encased by the same concrete building materials as the rest of
the building, in character with that.
Ms. Smiley That one handicap parking that is across the driveway,would
that be alright to put it closer to the building? The one in the
middle. It looks like a handicap parking space.
Mr. Long: I though all the handicap areas were in the southeast corner.
Mr. Taormina: That will all be reviewed by our Inspection Department to
determine compliance under the barrier free ordinance.
Ms. Smiley: I just didn't want a handicap person walking across the lot.
Mr. Taormina: That was intended to serve that entrance because there is
another ramp. This is the primary entrance for the employees
and for others coming in that side of the building. There is a
secondary entrance on this side of the building. I think it was
intended to serve that. So they may have to provide additional
spaces along that area to comply.
Mr. Long: Bigger too, right?
Ms. Smiley: I apologize. I thought they had to walk across the driveway.
Mr. Long: So you don't want to add that?
Ms. Smiley: No. Mark said that they will fix that so that they're not walking
across the driveway to get into the building.
Mr. Wilshaw: Okay. Please call the roll.
April 5, 2016
27525
A roll call vote on the foregoing resolution resulted in the following:
AYES: Long, Smiley, McCue, Wilshaw
NAYS: Ventura
ABSENT: Taylor
ABSTAIN: None
Mr. Wilshaw, Acting Chairman, declared the motion is carried and the foregoing
resolution adopted. It will go on to City Council with an
approving resolution. Thank you very much and good luck.
ITEM #2 PETITION 2016-03-LS-04 SALE OF CITY PROPERTY
15175 SANTA ANITA
Ms. Smiley, Secretary, announced the next item on the agenda, Petition 2016-
03-LS-04 submitted by the City of Livonia Housing, pursuant to
Section 3.05.050 of the Livonia Code of Ordinances, as
amended, to determine whether or not to dispose of City-owned
property at 15175 Santa Anita Avenue, located on the west side
of Santa Anita Avenue between Jamison Avenue and Five Mile
Road in the Northeast 1/4 of Section 24.
Mr. Taormina: This petition is to determine whether or not to dispose of certain
City-owned property currently under the management of the
Livonia Housing Commission. This property is located on the
west side of Santa Anita Avenue between Jamison Avenue and
Five Mile Road. The zoning of the parcel is R-U-F, Rural Urban
Farm, which requires a minimum of a half acre. This property is
described as Lot 95 of the Dutch Mill Gardens Subdivision. It is
0.56 acres with 87 feet of frontage along Santa Anita Avenue
with an average depth of roughly 281 feet. Lot 95 previously
contained a house that has since been demolished. The
property is bordered on all four sides by residential zoning and
single family homes. It was earlier this year that the Livonia
Housing Commission adopted a resolution approving the sale of
this property. The Board of Commissioners deemed that the
property is surplus and that there are no future plans to develop
the site. The property was acquired in 2015 through the Wayne
County tax foreclosure program using federal dollars. Pursuant
to Chapter 3.05 of the Code of Ordinances, before the City
Council can act on any proposed disposition of city-owned
property, the item must first be reviewed by the Planning
Commission for its recommendation on whether or not the City
should dispose of the property and its advice as to whether
there is any plausible alternative uses for the property.
April 5, 2016
27526
Additionally, the property must be appraised and referred to the
City Attorney for advice on any legal manners regarding the
disposition of the property. This site has been surveyed. An
appraisal has been completed. I believe that report is provided
in your packet. With that, I'll answer any questions.
Mr. Wilshaw: I think there is one item of correspondence.
Mr. Taormina: There is one item of correspondence from the Engineering
Division, dated March 14, 2016, which reads as follows: "In
accordance with your request, the Engineering Division has
reviewed the above referenced petition. The Engineering
Department has no objections to the proposal at this time. The
legal description provided with the petition appears to be correct
and is acceptable to this office. The existing parcel is assigned
an address of 15175 Santa Anita Avenue, which should be used
in conjunction with this petition. The existing building is currently
serviced by storm sewer, sanitary sewer and water main. Any
new connections to these utilities, or revisions to the existing
service leads within the right-of-way will require the owner to
submit plans to the Engineering Department for permitting."The
letter is signed by David Lear, P.E., Assistant City Engineer.
That is the extent of the correspondence. With us this evening is
Jim Inglis, Director of the Housing Commission. He can answer
any questions you may have.
Mr. Wilshaw: Are there any questions for Mr. Taormina? If not, we'll go to Mr.
Inglis.
James M. Inglis, Director, Livonia Housing Commission, Patrick V. McNamara
Towers, 19300 Purlingbrook Road, Livonia, Michigan 48152.
Good evening. The City of Livonia purchased this property in
July of 2015. Each year the City Treasurer receives a list from
Wayne County as to properties that are going through property
tax foreclosure. We did acquire five properties in July. These
are all vacant properties. They have not paid property taxes for
the previous three years. We have used Federal Community
Development Block Grant Funds. We've paid all the back taxes
to all the taxing authorities. The Housing Commission has
reviewed this parcel and we have determined we do not want to
use it for development purposes. We would prefer to sell it to a
private sector and get it back on the tax rolls. As we said, we
had a substandard house on the property that was quite old.
That property has been razed. Once the Planning Commission
and the City Council moves forward and this property is
disposed of, the proceeds from the sale of the property will be
returned to this Federal Community Development Block Grant
April 5, 2016
27527
program for future acquisitions down the road. The property has
been appraised at $34,000 as vacant land. As Mr. Taormina
said, the lot is 87 feet by 281 feet, so we believe there will be
quite a bit of interest in purchasing this property as there is a
home just three doors down, there's new construction going on
right now.
Mr. Wilshaw: Excellent. Thank you for that presentation. Are there any
questions of Mr. Inglis?
Mr. Ventura: Do you know how much money the City has invested in the
property?
Mr. Inglis: With the razing of the property, that was $10,000 and the back
taxes on this property were $12,000.
Mr. Ventura: So we're likely to make a profit on it?
Mr. Inglis: Correct, but under the State law, any profit generated from the
sale of tax foreclosed property must be returned to the County.
So we will recover all of our administrative costs, demolition
costs, acquisition cost and then whatever proceeds are left will
go back to the County.
Mr. Ventura: Great. Thank you.
Mr. Wilshaw: Is there anybody in the audience that wishes to speak for or
against the granting of this petition? Thank you, Mr. Inglis.
would like to just say that this is a good program for the city. It's
a great way to see difficult properties in our community, using
federal money and other sources, rehabilitated and reused even
if the city isn't gaining a profit from it. It still definitely benefits the
community. Is there a motion on the floor?
On a motion by Ventura, seconded by Long, and unanimously adopted, it was
#04-27-2016 RESOLVED, that pursuant to a Public Hearing having been
held by the City Planning Commission on April 5, 2016, on
Petition 2016-03-LS-04 submitted by the City of Livonia Housing
Commission, pursuant to Section 3.05.050 of the Livonia Code
of Ordinances, as amended, to determine whether or not to
dispose of City-owned property at 15175 Santa Anita Avenue,
located on the west side of Santa Anita Avenue between
Jamison Avenue and Five Mile Road in the Northeast 1/4 of
Section 24, the Planning Commission has no objections to the
sale of City-owned property located at 15175 Santa Anita
Avenue, subject to adopted policies and ordinances involving
April 5, 2016
27528
such transactions; further, this recommendation is based on a
determination that there are no current or anticipated City uses
for the property, and no compelling reason exists to delay the
sale of the property as requested.
Mr. Wilshaw, Acting Chairman, declared the motion is carried and the foregoing
resolution adopted. It will go on to City Council with an
approving resolution.
ITEM #3 PETITION 2016-03-LS-08 SALE OF CITY PROPERTY
8875 MIDDLEBELT
Ms. Smiley, Secretary, announced the next item on the agenda, Petition 2016-
03-LS-08 submitted by the City of Livonia Housing Commission,
pursuant to Section 3.05.050 of the Livonia Code of Ordinances,
as amended, to determine whether or not to dispose of City-
owned property at 8875 Middlebelt Road, located on the west
side of Middlebelt Road between Joy Road and Dover Avenue
in the Southeast 1/4 of Section 35.
Mr. Taormina: This is very similar to the previous item. It is a request to
determine whether or not to dispose of City-owned property.
This site is on the west side of Middlebelt Road, just north of Joy
Road. The zoning is C-1, Local Business. The parcel is
described as Lots 47, 48 and 49 of the Bonaparte Gardens
Subdivision. This lot measures 60 feet by 100 feet for a total
area of 6,000 square feet. Lying immediately to the north of this
property is another residence, which is actually a nonconforming
use because that residential structure is located on similar
zoned property, C-1. Immediately to the south is the Town &
Country Bike Shop, also zoned C-1, and then further to the
south and north are other commercial properties. The C-1
zoning exists along that stretch of Middlebelt Road on the west
side. On the opposite side of the alley, there are other
residential structures. Again, the Livonia Housing Commission
has adopted a resolution approving the disposal of the subject
property, and there are no future plans to develop the site.
Survey and appraisals have been completed and should the
Planning Commission and City Council deem that the property
is surplus, the Housing Commission and Finance Department
will proceed with the sale of the property in accordance with city
law. With that, I can read out the single item of correspondence
we have received.
Mr. Wilshaw: Go ahead.
April 5, 2016
27529
Mr. Taormina: There is one item of correspondence from the Engineering
Division, dated March 14, 2016, which reads as follows: "In
accordance with your request, the Engineering Division has
reviewed the above referenced petition. The legal description
provided with the petition appears to be correct and is
acceptable to this office. The existing parcel is assigned an
address of 8875 Middlebelt Road, which should be used in
conjunction with this petition. The existing building is currently
serviced by storm sewer, sanitary sewer and water main. Any
connections to these utilities by the future owner will require
Engineering Department permits, as well as permits from
Wayne County for any work within the Middlebelt Road right-of-
way. As specified in the City of Livonia ordinances, any new
development of the parcel (with the exception of single family
residential) will require storm water detention per City of Livonia
design standards for any of the improved areas. Any
connections to the storm sewer located within Middlebelt Road
will require Wayne County approval and permits." The letter is
signed by David Lear, P.E., Assistant City Engineer. Thank you.
Mr. Wilshaw: Are there any questions for Mr. Taormina? If not, we'll go to Mr.
Inglis.
James M. Inglis, Director, Livonia Housing Commission, Patrick V. McNamara
Towers, 19300 Purlingbrook Road, Livonia, Michigan 48152.
Thank you. Again, this property was acquired in 2015 via the
Wayne County Tax Foreclosure program. There was a
substandard structure on this property as well. As a matter of
fact, it had been a major problem for the Livonia Police
Department with vagrants entering the building quite often. We
have secured the building. We have demolished the structure
on the lot. As Mr. Taormina said, this is a smaller lot, 60 by 100
feet. It does have an alley in the back of the property as well. It
is adjacent to the bicycle shop. We demolished the property for
$5,800 and the back taxes were $8,000. Again, we believe we
will be able to recover our costs for disposing of this property.
We had an appraisal done in two different ways. One to
purchase the property in "as is" condition and one with us
demolishing the building and then selling it. The appraisal with
the building demolished by us was $34,200, which we thought
very reasonably. So that would be the amount we would list it
for sale. As Mr. Taormina said, it is zoned C-1. It would be
eligible for R-1 but it would have to go through the proper
process through the City of Livonia. If the purchaser wished to
convert it to residential, as you noticed, right next door to a
bicycle shop and also the heating and cooling company further
April 5, 2016
27530
to the north, which I believe is vacant at this time. So we would
like to sell this property and dispose of it and get it back on the
tax rolls.
Mr. Wilshaw: Excellent. Thank you, Mr. Inglis. Are there any questions from
the Commissioners? Seeing none, I think we're all set. A motion
would be in order then. .
On a motion by Long, seconded by Smiley, and unanimously adopted, it was
#04-28-2016 RESOLVED, that pursuant to a Public Hearing having been
held by the City Planning Commission on April 5, 2016, on
Petition 2016-03-LS-08 submitted by the City of Livonia Housing
Commission, pursuant to Section 3.05.050 of the Livonia Code
of Ordinances, as amended, to determine whether or not to
dispose of City-owned property at 8875 Middlebelt Road,
located on the west side of Middlebelt Road between Joy Road
and Dover Avenue in the Southeast 1/4 of Section 35, the
Planning Commission has no objections to the sale of City-
owned properties located at 8875 Middlebelt Road, subject to
adopted policies and ordinances involving such transactions;
further, this recommendation is based on a determination that
there are no current or anticipated City uses for the property,
and no compelling reason exists to delay the sale of the
property as requested.
Mr. Wilshaw: I did not ask if there was any audience communication on this
item. If there is anybody in the audience wishing to comment,
please come forward.
Faris Shahadi, 19750 Beck Road, Northville, Michigan. Thanks for demolishing
that property. It definitely caused a lot of issues. The question
on this property here is, since the sale is approved by the
council here, when would that take effect? Who would be
contacted for the purchasers and other interested parties?
Mr. Wilshaw: I think Mr. Inglis can answer that question.
Mr. Inglis: With Planning Commission approval, we will proceed to
advertise this in the Livonia Observer for sale. The City Clerk
will be taking bids on this property at the end of April, early May.
If you would like a packet to purchase this property, we would
be more than happy to give you one, and then once we receive
proposals from developers or whoever wishes to purchase it, it
would then go on to City Council with your resolution and a
sales contract.
April 5, 2016
27531
Mr. Wilshaw: Excellent. Thank you. I think that answers that question. With
that, we do have an approving resolution on the floor. It's been
supported. The Secretary can call the roll if there is no
discussion.
Mr. Wilshaw, Acting Chairman, declared the motion is carried and the foregoing
resolution adopted. It will go on to City Council with an
approving resolution.
ITEM #4 PETITION 2016-03-SN-01 SEVEN MILE CROSSING
Ms. Smiley, Secretary, announced the next item on the agenda, Petition 2016-
03-SN-01 submitted by CU Solutions Group requesting approval
for additional wall signage pursuant to Section 18.47 of the City
of Livonia Zoning Ordinance #543, as amended, for the four-
story office building (Seven Mile Crossing) at 38695 Seven Mile
Road, located on the south side of Seven Mile Road between
Haggerty Road and the 1-275/96 Expressway in the Northwest
1/4 of Section 7.
Mr. Taormina: This is a request to install two identification wall signs on an
existing office building that is located at the Seven Mile Crossing
office complex. The complex consists of three four-story
buildings located on the south side of Seven Mile Road just
west of the 1-275 Expressway. CU Solutions Group, the
petitioner, occupies roughly one-fourth of the office building that
is situated at the easterly end, the site closest to the
Expressway. Under the PO, High Rise Professional Office
district regulations, buildings of this size are allowed one wall
sign not to exceed 100 square feet. The building currently has a
sign located on the east side directly facing 1-275. That sign was
approved in 1999. It identifies the building's largest tenant,
Siemens. They occupy the third and fourth floors of the building,
or about 45,500 square feet. The sign that is presently located
on the building is about 95 square feet in area. The two
proposed wall signs would be installed on the north and south
sides of the building. One would face Seven Mile Road and
would have visibility to southbound traffic on 1-275, and the
other would face south, towards the college, but it would also be
visible to northbound traffic on the highway. Both signs would
read "CU Solutions Group." Each sign is 72.5 square feet in
area, so the three signs combined would total 240 square feet.
As a little bit of background, there are two other buildings that
make up the Seven Mile Crossing office complex. Each have
signs facing Seven Mile to identify the major tenants located in
April 5, 2016
27532
each of the buildings. The center building has a sign that
identifies Exel Logistics and that sign that measures about 100
square feet. Exel leases about 35,000 square feet within that
building. The westerly building has a sign that identifies
Workforce Software. This is the most recently approved sign.
They occupy about half of that building and that sign is about
200 square feet in size. It was approved by the Zoning Board of
Appeals this past fall. Obviously the proposed signage, because
it is in excess of what the ordinance allows, will require approval
by the Zoning Board of Appeals. This photograph has been
altered to show what the sign would look like. It gives you a
sense of scale. This sign would be located on the north side of
the building. There are some other details provided with the
documentation. Then they've done a similar rendering showing
what the sign would look like on the opposite or south side of
the building. Again, it would be the same size sign, 72.5 square
feet. With that, I can read out the single item of correspondence.
Mr. Wilshaw: Yes, please.
Mr. Taormina: There is one item of correspondence from the Inspection
Department, dated March 22, 2016, which reads as follows:
"Pursuant to your request, the above-referenced petition has
been reviewed. A variance from the Zoning Board of Appeals
would be required for the excess number of signs proposed.
This Department has no further objections to this petition." The
letter is signed by Jerome Hanna, Assistant Director of
Inspection. That is the extent of the correspondence.
Mr. Wilshaw: Are there any questions for Mr. Taormina?
Ms. Smiley They want a sign on the front, the back and the side?
Mr. Taormina: The petitioner wants a sign on the front and the back, and there
is one already on the side. That's the Siemens sign. This
illustration shows you where they want each sign — one on the
north side facing Seven Mile Road, the other one on the south
side, and then the existing sign is located on the east side of the
building.
Ms. Smiley: But is Siemens part of CU Solutions Group?
Mr. Taormina: No. They are a separate company. Siemens occupies the third
and fourth floors of that building, and they have a sign right now.
CU Solutions Group is requesting the two new signs.
Ms. Smiley: And this is for people driving down the expressway to find it?
April 5, 2016
27533
Mr. Taormina: I think that's a good question for the petitioner.
Ms. Smiley: Okay. Thank you.
Ms. McCue: Mr. Taormina, clarify for me again, the other buildings in that
park. How many signs do each of them have?
Mr. Taormina: Each have a single sign.
Ms. McCue: Just one?
Mr. Taormina: The middle building is where Exel Logistics is located. Their
sign is in the middle face of the building near the top. It's on the
fourth floor band facing Seven Mile, and it's roughly 100 square
feet which is the maximum that the ordinance allows. The other
building, the building closest to Andiamo, that also has a sign
similarly situated on the building in the middle of the main
entrance on the fourth floor. That sign is about twice as large,
200 square feet and is the most recent of the three that exist in
the park.
Ms. McCue: But again, each of the others only have the one sign?
Mr. Taormina: That's correct.
Ms. McCue: Thank you.
Mr. Ventura: Mr. Taormina, am I correct that neither of the new signs that are
being requested tonight are illuminated?
Mr. Taormina: These signs are illuminated. There are details on the plan
showing how it will be illuminated using white LED lights.
Mr. Ventura: Internally illuminated?
Mr. Taormina: I'll let either the sign contractor or the petitioner describe that,
but yes. It's white outline with white LED, and usually those are
internally illuminated because they have a plexiglass face in
front of it.
Mr. Ventura: Thank you.
Mr. Wilshaw: Anybody else? Would the petitioner like to step forward? We will
need your name and address for the record please. Is there
anything you'd like to add to what you've heard so far?
April 5, 2016
27534
Kevin O'Connor, CU Solutions Group, 38695 W. Seven Mile, Suite 200, Livonia,
Michigan 48152. First off, the Siemen sign does face 1-275. The
three big buildings, two big building to the right of us, both have
way-finding signs on there. Our building is blank on that side.
For the purpose of way-finding as well as for our customers as
well as vendors that come to the location, I've experienced it
myself. Well, I'm not sure what building you're in. It's obviously
very tasteful and it's designed not for branding or anything other
than way-finding. That's our purpose and as well it's our
headquarters. We just remodeled it. We have a seven year
lease there. We love the location and this we feel is an
important part of our footprint there.
Mr. Wilshaw: And you're with CU Solutions?
Mr. O'Connor: I am with CU Solutions. I'm with Michigan Credit Union League
and affiliates, which is the parent company. I'm the chief
financial officer and senior vice president of the organization.
Mr. Wilshaw: Okay. Very good. So you understand what kind of business this
is and the need to have people find your building?
Mr. O'Connor: I do. We would certainly be grateful to have signs on both sides
of the building from a way-finding standpoint to see it north and
south on 1-275. I travel that road every day. It's certainly well
marked and our building is not. Again, we've made a
considerable investment, have over 100 employees that work
here, and continue to grow. We'll be adding in that location. I
appreciate your consideration.
Mr. Wilshaw: Very good. Thank you, Mr. O'Connor. Are there any questions
from the Commission? I think we're all set. Thank you. One
more gentleman coming forward. Your name and address
please.
Greg Woelfel, 38038 Newburgh Road, Livonia, Michigan. I'm representing Vital
Signs who would be the contractor for construction of the sign. If
I may hand out one additional handout which you folks haven't
yet seen, but I think it will answer some of the questions you've
asked this evening.
Mr. Wilshaw: You can hand them to Ms. Watson and she'll send them along.
Mr. Woelfel: Okay. This is going to give you an aerial view of this site of all
three buildings where the existing signs on the two building
further to the west are. You'll see the Siemen sign on the end of
the building. The building that we are proposing to install the CU
April 5, 2016
27535
Solutions Group sign currently has no sign on the fascia, on the
front of that building or on the back of that building at the
present time. Maybe that will help you visualize that better.
Additionally, a question was asked previously about illumination.
Yes, we would be illuminating the sign using internal LED
lighting, 12 volts, very little voltage lighting, which is the
standard today in what are called channel letter signs. The sign
is shown to be 72.5 square feet and that's to fit on the fascia in
proportion to the fascia, although the code would allow for up to
100 square feet, were no other signs present on the building at
the current time. I can answer any other questions.
Mr. Wilshaw: Thank you, Mr. Woelfel. Are there any questions from the
Commissioners?
Ms. Smiley Sir, I understand the need for the sign on the front. I'm not
convinced about the sign on the back because you're going to
get off at the exit at Seven Mile Road. Obviously that where's
your Garmin or I-phone is going to tell you where to go. And
then you're going to go down Seven Mile Road to come in here.
I can see where you would want them to be able to find you in
the building. Who is that sign in the back for?
Mr. Woelfel: I would say for northbound traffic on 1-275.
Ms. Smiley: So that they know to get off there?
Mr. Woelfel: Well, it's an identification. Yes.
Ms. Smiley I'm okay with the one on the front. I'm not at all excited about
the one on the back, but thank you.
Mr. Wilshaw: Are there any other comments or questions from the
Commission? Is not, I think we're all set. A motion would be in
order.
On a motion by Ventura, seconded by Smiley, and unanimously adopted, it was
#04-29-2016 RESOLVED, that the City Planning Commission does hereby
recommend to the City Council that Petition 2016-03-SN-01
submitted by CU Solutions Group requesting approval for
additional wall signage pursuant to Section 18.47 of the City of
Livonia Zoning Ordinance #543, as amended, for the four-story
office building (Seven Mile Crossing) at 38695 Seven Mile
Road, located on the south side of Seven Mile Road between
Haggerty Road and the 1-275/96 Expressway in the Northwest
1/4 of Section 7, be approved subject to the following
April 5, 2016
27536
1. That this approval is for only one (1) additional wall sign.
The petitioner shall have the option of installing the
additional wall sign on either the north or south elevation of
the building;
2. That the wall sign shall be installed in accordance with the
Sign Plan submitted by CU Solutions Group, as received
by the Planning Commission on March 14, 2016; and
3. That this approval is subject to the petitioner being granted
variances from the Zoning Board of Appeals for excessive
signage and any conditions related thereto.
Mr. Wilshaw, Acting Chairman, declared the motion is carried and the foregoing
resolution adopted. It will go on to City Council with an
approving resolution.
ITEM #5 APPROVAL OF MINUTES 1,084th Public Hearings and
Regular Meeting
Ms. Smiley, Secretary, announced the next item on the agenda, Approval of the
Minutes of the 1,084th Public Hearings and Regular Meeting
held on March 22, 2016.
Mr. Wilshaw: I do have a question for Mr. Taormina. We only have three
members present of the Board. Are there sufficient votes for the
minutes?
Mr. Taormina: We'll have to wait for Mr. Taylor to be present. I think this
happened one other time and we made a decision to push it off
to the next meeting when we did have a quorum of the
members that were present at the meeting in question. Will we
have four?
Mr. Wilshaw: We'll have four.
Ms. Smiley: You'll have four but we wouldn't be able to vote because we
weren't present. We'll never have five.
Mr. Wilshaw: As long as we have Mr. Taylor back.
Mr. Taormina: We'll just push it to the next meeting for the approval of the
minutes.
Mr. Wilshaw: I won't be at the next meeting.
April 5, 2016
27537
Mr. Taormina: Oh, that's right.
Mr. Wilshaw: We'll just keep pushing. The controversy was over the approval
of the minutes. We didn't want to improperly approve them.
Ms. Smiley: Three out of the four are here that were present at that meeting.
Isn't that a quorum? Because Lee is never going to come back
to vote.
Mr. Taormina: I don't know how Robert's Rules would treat this. I'm sure there
are circumstances when boards and commissions lose a
majority of their members and have to approve minutes. Now,
as I sit here and think about it, I'm sure that it's appropriate to
vote this evening.
Mr. Long: It's it not correct, it would have to come back, right?
Mr. Taormina: Yes, if there's any challenge to the minutes and they are more
or less verbatim taken from the tapes. There's little risk in it
coming back.
Mr. Wilshaw: Let's go through the process of Item 5 then and we will make
sure that meets Roberts Rules.
On a motion by Long, seconded by Ventura, and adopted, it was
#04-30-2016 RESOLVED, that the Minutes of 1,084th Public Hearings and
Regular Meeting held by the Planning Commission on March
22, 2016, are hereby approved.
A roll call vote on the foregoing resolution resulted in the following:
AYES: Long, Ventura, Wilshaw
NAYS: None
ABSENT: Taylor
ABSTAIN: Smiley, McCue
Mr. Wilshaw, Acting Chairman, declared the motion is carried and the foregoing
resolution adopted.
Mr. Wilshaw: Is there anything else to come before us tonight?
Ms. Smiley: We want to welcome our new member.
Mr. Wilshaw: We do. I actually have two items of general interest. One is, I
want to thank Mr. Long for filling in as Acting Secretary for the
April 5, 2016
27538
last couple meetings. It was very appreciated, and we do have a
new member of the Commission, which is Betsy McCue. We
want to welcome you to the Planning Commission and we look
forward to working with you.
Ms. McCue: Thank you.
On a motion duly made, seconded and unanimously adopted, the 1,085th Public
Hearings and Regular Meeting held on April 5, 2016, was adjourned at 8:18 p.m.
CITY PLANNING COM •SION
/ it AT
Carol A. Smiley, S retary
OF
ATTEST: g4 W. ( )
I Wilshaw, Chairman Pro Tem